A recent subdivision in the south-west of
Calgary had a feature storm pond, which was part of a community wetlands effect. However, upon completion, the storm pond drained very rapidly, through the pre-cast joints of the box culvert system. The standard ram-neck was ineffective under the hydrostatic pressure of the full pond.